pSIM
ProductionSIM
Manufacturing simulation platform
or
Signed out.
Production Flow
Warehouse CNC Lathe Assembly Quality ✓ Util: 87% Util: 92%
Design the flow, bring the factory to life
Connect stations, build capacity and routing logic in seconds.
8Stations
24Routes
100%Visual
Simulation Engine
⚠ Bottleneck Simulation Time (days) Capacity (%) 0 50 100
Simulate, find the bottleneck
The discrete-event engine computes real production behavior in milliseconds.
2.4sSim Time
14KEvent
+18%Efficiency
Shift Calendar
Mon Tue Wed Thu Fri Sat Sun 08:00 22:00 Break
Define shifts, manage time
Integrate morning / night / weekend shifts and breaks into the simulation.
3Shifts
7/24Coverage
AutoAuto Calc
Gantt & Results
Job A Job B Job C Job D Job E Makespan: 18 days Day 5 Day 10 Day 15
Visualize time with Gantt
See all work orders on one screen. Instantly detect makespan, delays, and critical path.
18Gün
5Job
0Delay
Modal